Thought it was about time to update my done/to do list. Due to some awful vibration I had to change the drive-shafts. Wasn't sure which side so did both. Thanks to SJ Sports I was able to get 2 new shafts, although I bought a short (inner) shaft for the driver's (UK) side and re-used the outer CV joint. This was in good condition and not causing a problem. This saved a fortune due to SJ's pricing. Too complex to explain: just look at their site for M100 drive-shafts full or half and compare prices.....
So here's my updated list:
Jobs done (more recent in red)
1) Wilwood front brake upgrade (caliper 120-8728)
2) Electric remote boot release
3) Electric remote fuel flap release.
4) Put silencer on blow-off valve
5) Fit combined radio/stereo/sat nav/Bluetooth Xtrons D-714SG
6) Amp for above Auna 2800 95w rms
7) New speakers all round Auna 5.5" at rear Juice 4.5" at front
8 ) Repaired broken slider on window
9) Group buy separate hub/disc on rear brakes
10) New cam belt/idler/tensioner/water pump (belt again late 2019)
11) VW Golf relay for variable intermittent wipe
12) Fitted BCN gear change cables and short shift linkage.
13) Fitted new dial faces to funboy 3
14) Replace elastic tensioners on hood
15) Fitted gas struts to boot lid
16) Fitted Samco water hoses
17) Refurbish seats with heated seat panels
18) Fitted stainless steel fitting kit to wheel arch liners.
19) New "B" post caps
20) Fitted gas struts to bonnet
21) Clean out proportioning valves
22) Replaced rear calipers with PNM kit
23) New rear pads
24) 3rd brake lights fitted to wind deflector
25) Fitted braided rear brake hoses
26) Fitted new drive-shafts (and re-fill gearbox!)
27) 2 new tyres (Toyo Proxes)
28) New plugs, cleaned filter, adjusted CO2 pot Still to do
1) Set ride height as per Dave's instructions above (imminent)
2) 4 wheel tracking set-up (imminent)
3) Fit stainless steel fitting kit to headlights.
4) De-rust suspension parts, protect and paint.
5) Re-furbish wheels
Tidy up paint work, anything else that arises or is needed for MOT success!
In between some of these recent jobs I have moved house, built a kitchen and office, re-built the brakes on the old S4, laid a new floor in the dining/kitchen/conservatory and had a few holidays. Next on the list after the small latter of a wedding and honeymoon in Berlin is a September Lotus holiday (with 7-8 other Lotus) to the Rhine and Black Forest. Rob P will be one of them (this time in a Lotus please!!) Looks like it's a German year this year.
Happy motoring one and all

La vie passe vite: vivez la avec elan(s).
Elan S4 DHC 1969
Elan SE turbo 1992
Evora 2010 NOW SOLD
MB E250 CDi coupe 2013
Boardman Endurance SLR 9.4 disc 2018
Rapido 746 2010
Lotus Evija Danish edition