Hi Gary,
Gazza wrote: Rollbar is looking good, maybe you should have fitted them first before chroming. Then you could have just dropped them in place once they were done, with less chance of damaging them.

I gave that some thought. I plan on wrapping the bar up with they same stuff they wrapped it in when i picked it up. Gloves ona nd no watches, rings, etc. on. Its not going to stop a major scratch but it'll offer some proteciton. we'll be going real slow as we install it

Gazza wrote: Have also been trying to work out a way of fixing the glass/plastic in the centre and possibly some mess in the hoops.
I'm planning on having a custom piece of glass cut and then getting it tempered. Thus the tabs you see on the bar. I was concerned that a piece of glass wouldn't flex enough if the rollbar was straining under hard cornering and would shatter. So, I drilled the holes in the tab large enough to mount rubber grommets in the holes and will do the same with the glass. The short bolts will then "float" in the rubber grommets so as not to shatter the glass and allow some play with the rollbar moving and stressing. it should move that much but even a little flex could burst the glass.
As for the mesh.................well, that was the other little enhancement I wasn't going to comment on until I knew if my plan was going to work. But, since you've mentioned it, let me tell you what I have in mind.
I gave this a lot of thought. With the rollbar staring me in the face all winter I could afford to take my time. I've already bought some metal perforated metal and drawn up some templates for them to fit into the "hoops". The problem is in mounting them.............
I initially thought of having them gas arc welded which leaves a tiny bead. But, I just don't think that would look good. having a bead around the inside of the hoops and all. So, i tried to devise a way that wouldn't involve weldong. Here's what I've settled on.
I've had some custom rubber U-channel made up. Its got a curved bottom to rest on the rollbar a a groove in which the metal will sit. I am going to cut it to fit inside the hoops and use double sided carpet tape on the bottom of the rubber to mount it to the inside of the rollbar. The tape's really tacky and I've got no concern that it'll hold the mesh in place once (if) it goes in. I'll be painting them gloss black too.
The channel should arrive by the end of the month. I had to order a minimum 50 foot run so I'll have lots left over. Shouldn't take more than 10 feet to do both hoops with some margin for error. I'll post the final result when its done for all to see. If you like the idea, and haven't done anything yet, I can sell you some of the u-channel for you to use (would help me recover some of the expense for the minimum run too).